Petronas Gas Berhad, Kerteh

Client Name Project Title Completion Date
PETRONAS GAS BERHAD
  • The Provision For Procurement, Supply, Delivery, Installation And Testing Of Surge Protection Device/Lightning Arrestor At GPP5 (GPP‐B), Paka, Terengganu, Petronas Gas Berhad

October 2014
PETRONAS GAS BERHAD
  • The Provision For Procurement, Supply, Delivery, Installation, Testing Of Surge Protection Device/Lightning Arrestor at GPP6 and ET,Terengganu, Petronas Gas Berhad

February 2009
PETRONAS GAS BERHAD
  • To Supply, Install, Testing and Commissioning of Level Transmitter at GPP1, 2 and 3.

April 2009
PETRONAS GAS BERHAD
  • Provision Of Design, Supply, Delivery, Testing, Installation & Commissioning Of Gpp‐Nh3601 Ups System Replacement At Gas Processing Plant Complex A.

July 2003
PETRONAS GAS BERHAD
  • The Provision For Engineering, Supply, Install, Testing And Commissioning Of 2 X 10 Kva Uninterruptible Power Supply System (UPS) Complete With All Related Works At Kerteh Compressor Station A (KCS ‐ A), Petronas Gas Berhad, Kerteh, Terengganu.

     

March 2006
PETRONAS GAS BERHAD
  • To Supply and Delivery of Socomec UPS Capacitor at GPPA Petronas Gas Berhad, Kerteh.

February 2009
PETRONAS GAS BERHAD
  • The Provision For Engineering, Procurement, Construction And Commissioning For Upgrading Of Ups At It Data Center, GPPA, Pod, Petronas Gas Berhad

October 2014
PETRONAS GAS BERHAD
  • Provision Of Design, Supply, Delivery, Testing, Installation & Commissioning Of Nh‐5506 24v Dc Socomec Ups System Replacement At Export Terminal Kemaman, Terengganu.

August 2003