|
PETRONAS GAS BERHAD |
The Provision For Procurement, Supply, Delivery, Installation And Testing Of Surge Protection Device/Lightning Arrestor At GPP5 (GPP‐B), Paka, Terengganu, Petronas Gas Berhad
|
October 2014 |
Show Details |
|
PETRONAS GAS BERHAD |
The Provision For Procurement, Supply, Delivery, Installation, Testing Of Surge Protection Device/Lightning Arrestor at GPP6 and ET,Terengganu, Petronas Gas Berhad
|
February 2009 |
Show Details |
|
PETRONAS GAS BERHAD |
|
April 2009 |
Show Details |
|
PETRONAS GAS BERHAD |
Provision Of Design, Supply, Delivery, Testing, Installation & Commissioning Of Gpp‐Nh3601 Ups System Replacement At Gas Processing Plant Complex A.
|
July 2003 |
Show Details |
|
PETRONAS GAS BERHAD |
The Provision For Engineering, Supply, Install, Testing And Commissioning Of 2 X 10 Kva Uninterruptible Power Supply System (UPS) Complete With All Related Works At Kerteh Compressor Station A (KCS ‐ A), Petronas Gas Berhad, Kerteh, Terengganu.
|
March 2006 |
Show Details |
|
PETRONAS GAS BERHAD |
|
February 2009 |
Show Details |
|
PETRONAS GAS BERHAD |
The Provision For Engineering, Procurement, Construction And Commissioning For Upgrading Of Ups At It Data Center, GPPA, Pod, Petronas Gas Berhad
|
October 2014 |
Show Details |
|
PETRONAS GAS BERHAD |
Provision Of Design, Supply, Delivery, Testing, Installation & Commissioning Of Nh‐5506 24v Dc Socomec Ups System Replacement At Export Terminal Kemaman, Terengganu.
|
August 2003 |
Show Details |