|
MAJLIS AMANAH RAKYAT (MARA) |
Proposed Construction and Completion of Works on Fire Protection System Installation for the Proposed Construction and Transportation Complex up to Eight Floor at Lot 202, Section 14, Town of Klang, Selangor Darul Ehsan:
1) Hose Reel System
2) Fire Alarm System
3) CO2 System
|
May 2004 |
Show Details |
|
MAJLIS AMANAH RAKYAT (MARA) |
|
September 2001 |
Show Details |
|
MAJLIS AMANAH RAKYAT (MARA) |
Design, Build, Preparing and Certifying Malaysian Institute of Aviation Technology (MIAT) at Lot 2891, Dengkil, Sepang, Selangor Darul Ehsan
1) Hose Reel System
2) Fire Alarm System (Addressable)
3) Sprinkler System
4) Wet and Dry Riser System
5) CO2 System
6) FOAM System for Jet Hanger
|
December 2001 |
Show Details |
|
MAJLIS AMANAH RAKYAT (MARA) |
Proposed Construction and Completion of Trade Institute of MARA (IPM) Seri Iskandar at Upper Lot PT 2635, Bandar Seri Iskandar, Perak Tengah District, Perak Darul Redzuan, Malaysia.
|
May 2004 |
Show Details |