|
KUALA LUMPUR CITY HALL (DBKL) |
To Supply, Delivery, Installation, Testing and Certifying "Hose Reel" System and Complete Equipment For Public Housing Program For One Year Period (2008/A021)
|
September 2010 |
Show Details |
|
UNIVERSITY OF MALAYA / PAN SEJATI ASSOCIATES |
Tender For Mechanical Works For Proposed Renovation at Wisma TM (Office Building 1st Floor 24 Floor With The Existing Underground) at Lot 33507 and Lot 13150, Jalan Pantai Bahru, Kuala Lumpur Become Postgraduate School:
- Air-Conditioning System
- Fire Fighting System
- Lift System
- Plumbing System
- Cold Water System
|
June 2010 |
Show Details |
|
SAMCHANG ENTERPRISE (M) SDN BHD |
Proposed Addition & Alteration to Existing 6 Storey Hotel Development on Lot 18, 48, 49, 50, 309 & 307, Sek. 1, Bandar Batu Feringghi, D.T.L, Pulau Pinang (5 Stars Hard Rock Hotel)
- Fire Protection Works
|
September 2009 |
Show Details |
|
TMF SERVICES |
Proposed Supply And Install NOVEC 1230 Fire Suppression System For PCM, Rectifier, MSB & Fiber Room At TM Bukit Bintang, Kuala Lumpur.
|
June 2009 |
Show Details |
|
TMF SERVICES |
Proposed Works for Fire Protection System Installation for Fire suppression & Fire Alarm System And Related Works In Project New Generation Network (NGN) - IP Core on Level Two, TM Jalan Raja Chulan, Kuala Lumpur.
|
April 2009 |
Show Details |
|
RANHILL GROUP / PORTNEKA SDN BHD |
Melut Basin Oil Development Project – Up Stream Facilities Engineering, Procurement, Construction and Commissioning (EPCC) for Al-Jabalyn Central Processing of Fire Fighting System for Al-Jabalyn Central Processing Facilities, Palague Filed Production Facilities & Operation Base Camps Ranhill-Petroneeds
- Fire Fighting Facilities
|
December 2008 |
Show Details |
|
KUALA LUMPUR CITY HALL (DBKL) |
To Supply, Deliver, Install, Testing & Commissioning of Hose Reel System and complete equipment for Program Perumahan Rakyat DBKL for 2 years contract period (18th Floor for 91 Blocks)
|
February 2008 |
Show Details |
|
SPNB-LTAT |
Proposed Development for Malaysian Army in Lembah Klang – Wardieburn Camp consist of 3 block Class G Quarters.
- Fire Protection System
- Supply, Install, Testing and Commissioning
|
January 2008 |
Show Details |
|
SPNB-LTAT |
Proposed Development for Malaysian Army in Lembah Klang – Wardieburn Camp consist of 1 Block Class E 20 unit Quarters (6 Stories), 1 Block Class F 24 unit Quarters (7 Stories) and 5 Block Class G 532 Quarters (15 Stories).
- Fire Protection System
- Supply, Install, Testing and Commissioning
|
April 2007 |
Show Details |
|
PEREMBA CONSTRUCTION SDN BHD |
Proposed Development of Embassies Offices at Precinct 15, at Part of Lot PT 49, Diplomatic Enclave, Precinct 15, Putrajaya, Putrajaya Putrajaya Corporation - Supply, Delivery, Installation, Completion, Testing and Commissioning of Fire Protection Works.
|
January 2006 |
Show Details |