PAAB |
1) The Proposed Upgrading & Rehabilitation Water Treatment Plants in Negeri Sembilan for Year 2011; and
2) The Proposed WTP Residual Management & Treatment Plant in Negeri Sembilan for Year 2011.
Package 1 – The Proposed Upgrading and Rehabilitation of Mechanical & Electrical Works and Related Works
|
April 2013 |
Show Details |
SYABAS |
Supply, Install, Testing and Commissioning of a Complete Pumping System at Beranang Lion Industry Pump House, Hulu Langat
|
December 2012 |
Show Details |
JABATAN BEKALAN AIR WILAYAH PERSEKUTUAN LABUAN |
|
April 2012 |
Show Details |
JABATAN PENGAIRAN & SALIRAN |
|
June 2010 |
Show Details |
UNIVERSITY OF MALAYA / PAN SEJATI ASSOCIATES |
Mechanical Works For Proposed Renovation at Wisma TM (Office Building 1st Floor 24 Floor With The Existing Underground) at Lot 33507 and Lot 13150, Jalan Pantai Bahru, Kuala Lumpur Become Postgraduate School:
- Air-Conditioning System
- Fire Fighting System
- Lift System
- Plumbing System
- Cold Water System
|
June 2010 |
Show Details |
RANHILL WATER TECHNOLOGIES SDN. BHD. |
Improvement to Muar Water Supply System – Design, Construction, Supply, Delivery, Installation, Testing and Commissioning of Work to Upgrade, Rehabilitate and Extension of the Existing Gerisek Water Treatment Plant
|
December 2008 |
Show Details |
KUALA LUMPUR CITY HALL (DBKL) |
|
September 2008 |
Show Details |
RANHILL ENGINEERS AND CONSTRUCTORS SDN BHD |
|
July 2007 |
Show Details |
RANHILL ENGINEERS AND CONSTRUCTORS SDN BHD |
|
May 2007 |
Show Details |
RANHILL ENGINEERS AND CONSTRUCTORS SDN BHD |
|
May 2007 |
Show Details |